I have two SLDs: a design time and a run time SLD for PI 7.1 SP07. I want to synchronize the SLDs by bringing over the business systems from my Design Time SLD to the Run time SLD. I am going to try to transport the business systems using CTS+, but if this doesn't work I would like to do a SLD sync.

My understanding is that a SLD sync will bring over all of the content (SWCV, projects, etc). I know the SLD data supplier will not forward any data manually created in the local SLD so that won't bring over my business systems.

Can I perform a SLD sync with just syncing up the technical/business systems without synchronizing the rest of the data?

Accepted Solutions (1)

Accepted Solutions (1)

stuart_campbell
Active Contributor
0 Kudos

Hi George

I think there are options to automatically sync only landscape data - this is the "automatic forwarding" option

alternatively you can use manual import/export of LD

I would check Page23 of the SLD planning guide available at for the exact options

Best wishes

Stuart