on 11-09-2009 5:45 AM
Dear all,
we are into Roll out now
in one plant already SAP is running fine
Now for second plant Configurations are done
is there any way we can copy all the master data of plant 1 to Plant 2
if yes, then plz let me know in detail t-codes wise
Regards
kumar
Dear Kumar
1) Create Sampling procedure & Sampling scheme (QDV1 & QDP1) . Both of them are at client level. so if is already created the you can use them
2) Create Inspection method. QS31 . This is plant wise
3) Create MIC (QS21) (Master inspection characteristic - this is nothing but the testing parameter) - This is plant wise
4) Create inspection plan (QP01) - This is plant wise and can be assigned using material assignment
Hope this gives an idea
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Kumar
if the replies of all suffices your current requirement you may kindly close or else you may please continue till you are satisfied
Best Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Ganesh,
As i said earlier also i am an PP Consultant & very much new with QM
and currently i am trying in Sand Box
so definitely errors will occur
so have to raise query again & again
but still i know now the time has come to close this thread
so as now i am closing this thread
Once again thanks to You, Shayamlal & Anand
Regards
kumar
Dear Kumar
1) Copy of Inspection plan is possible but the problem is individual you will have to do it. In QP01 tocde you can see a copy model option which allows you to do so
The tables for inspection plan are PLKO, PLPO and PLMK
2) If the inspection plan for the both the plants are same then you can use Material assignment in the inspection where you can give the material code and plant with group details so tht the fresh creation of inspection plan can be avoided.
Authorisation related issues can come in this methos
3) But I would recommend you to kindly create BDC for the master data and take dump of the table and re arrange to upload the data
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Kumar
There is no mass copy available. Individualy you will have to go to the tcode and do it
one more thing is that the master data of one plant can be used for another. Only inspection plan just like routing you will have to assign the new plant and material code
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Ganesh,
Thanks for ur reply
u mean to say i can copy inspection plan right ??
can u let me know table for this
where all inspection plans data will be stored
so that i can go for LSMW
Can u let me know what do you mean by ur below statement, unable to understand it
one more thing is that the master data of one plant can be used for another
Regards
kumar
Edited by: kumar kumar on Nov 9, 2009 9:14 AM
Dear Kumar
yes QDP1 and QDv1 are at client level. Rest are at plant level.
Also inspection plan is missing in the list. QP01 which is very much required at plant level
Regards
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Kumar,
Download you relevant data from the respective table.
Create an uploading tool (LSMW,BDC)
Arrange the downloaded data in the format for Created BDC,LSMW
Upload the data.
For further assistance pls let me know what are the data there you need to upload.
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Shyamlal,
First of all thanks for ur reply
Now basically i am an PP Consultant
Now as per our QM user manual i am listing the t-codes of QM master data
Plz give a glance & reply
1) QS31 - inspection method
2) QS21 - Master inspection Characteristics ( qualitative & Quantitative )
3) QDV1 - Sampling Procedure
4) QDP1 - sampling scheme
Now i have checked the above Master datas in Plant 1
but in plant 2 none of the above datas exists
Plz let me know the tables for above data
How to Go Ahead Now
is QDV1 & QDP1 is will at client level
Waiting for ur valuable inputs again
Regards
kumar
Hi Kumar,
Yes, QDV1 & QDP1 are at client level.
Tables,
Master Data QMTB Inspection method master record
Master Data QMTT Inspection Method Texts
Master Data QPMK Inspection characteristic master
Master Data QPMT Master Inspection Characteristics Texts
These are very easy to download from these tables, and then It can be straight way can be up loaded at Another plant by the LSMW
Regards,
Shyamal
Dear Kumar,
As I have said you earlier also at least as per my information concern, There is no ready made tool available to copy the masters from plant 1 to Plant 2. You need to follow the procedure of Download and Upload.
Edited by: Shyamal Joshi on Nov 9, 2009 12:47 PM
Dear Shyamlal,
Once again thanks for ur prompt reply
i still wounder as there is no COPY option in QM for master data
As we have Copy aption in PP for all master datas
anyways will check with my Abaper for LSMW based on ur inputs
But i don't have a huge data in QM
so if possible can u let me know any other possible option from plant 1 to plant 2
Bust can u let me know & reply again on Copy option
this is just for my confirmation only
Once again thanks to You & Ganesh
Regards
kumar
>
> Dear Shyamlal,
>
> First of all thanks for ur reply
>
> Now basically i am an PP Consultant
> Now as per our QM user manual i am listing the t-codes of QM master data
> Plz give a glance & reply
>
> 1) QS31 - inspection method > 2) QS21 - Master inspection Characteristics ( qualitative & Quantitative ) > 3) QDV1 - Sampling Procedure > 4) QDP1 - sampling scheme
>
> Now i have checked the above Master datas in Plant 1
> but in plant 2 none of the above datas exists
> Plz let me know the tables for above data
>
> How to Go Ahead Now
>
> is QDV1 & QDP1 is will at client level
>
> Waiting for ur valuable inputs again
>
> Regards
> kumar
QS21 is MIC itself.
Regards,
Shyamal
Hello Kumar,
I had also came across the same requirement. I tried following options and surprisingly worked for me 100% correct.
For MIC
1. Develop LSMW by recording method for transaction code QS21 for MIC creation.
2. While recording LSMW use copy functionality that appears at initial screen in QS21.
3. Your template will be very small and will be consisting of only MIC Code, plants from which you have to copy the data and proposed MIC code and plant where you want to replicate the data.
4. Here all control indicators get copied automatically.
For inspection plan,
1. Develop similar LSMW by recording method for QP01 transaction code.
2. Care that you have to take are, Ensure that you enter group and group counter externally.
3. As quoted by Gajesh and Shyamal, here MICs of other plant (from which you copy inspection plan) gets copied and can be utilised. You need to ensure the user has authorization for accessing MICs of other plant.
4. Later if required you can change in CWBQM by mass maintenance.
Best Regards,
Anand Rao
Dear Anand, Ganesh, shyamlal & all
1) QDV1 - Sampling Procedure
2) QDP1 - sampling scheme
will the above both will be at plant level or client level
i couldn't find plant option for above two t-codes
Waiting for ur valuable inputs again
Added
OK this will be at Client level got it
Regards
kumar
Edited by: kumar kumar on Nov 9, 2009 2:10 PM
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.