on 11-06-2009 4:32 PM
Hi there;
I set-up integration between cProject and FI/CO with PS structure automatic creation after change status (set status "to transferred").
It work well in general, but there is something strange about wbs element code.
Infact, I change cproject project phase number with my own code; ps wbs element don't take this number but the first original number from cProject phase (eg. 19000000000000001542009).
Is this an error or it's normal?
Thanks a lot
Ciao
Luciano
HI Luciano,
It works as designed because of the following reasons:
1. The WBS ID in ERP system must be unique.
2. The phase-id in the cProject is NOT unique, you have e.g. same phase-id for two phases.
That is why the replication does not use the phase-id to create the WBS ID. The internal ID of phase is (default ID during creation of a phase) is used for replication
Though there is a Badi method let you change the the WBS ID, but I would not recommend you to do it because of above reasons.
Kind regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
11 | |
6 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.