on 11-05-2009 2:28 PM
Hi Masters
Is there any possibility to block the instrument in use which is under calibration in SAP?
-Mohan
Yes U can Block equipment.
Go to Calibration Order (IW32) and set the SystCond to Zero and save.
Jay
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Do you means the Inspection lot is generated for a Equipment which is under calibration ,then there is no std SAP function which will block equipment automatically after you take UD of the calibration lot.
But
You can always go to IE02->equipment>functions-->either Deactivate the Equipment or put deletion flag.
Also you can create User status for Equipments like
CALB Calibrated
UNRP Under rapaire
NIU Not in Use
etc
SO that equipment will not be scheduled again.
I hope this will add some value.
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.