I am creating a project and I get the costing sheet for the WBS from the customizing and the same with the networks. The problem is that i don't want the Networks to have costing sheet but if I delete it from the customizing, I also loose the costing sheet for the WBS.
Is there a way to Have the costing sheet only in the WBS??
Thanks a lot in advance!!
in the WBS planning profile you can ente the costing variant
for this costing variant you can configure a valuation variant which carries a costing sheet
The network costing variant can be different without a costing sheet
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
I think the costing sheet is rolled down from WBS element to activity.
PL check
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.