Dear Experts,
We have requirement, when we do result recording for Production Inspection Lot [ 04 Insp Type] all the results has to be copyied to Delivery Inspection Lot [Insp Type 10]. Here Batch for both the lots are same.
1] we are creating Production order after release 04 Lot will triggers for the Batch.
2] Then for the same batch which has created in the Production we are going to deliver partly, Means this batch will spilt to 4 to 5 Delivery.
3] While doing PGI Delivery Inspection lot gets generates [Insp type 10] here system has to copy all the results values which have recorded at the time Production Result recoding in to Delivery Inspcection Lot.
Please provide me the solution.
Thanks
DON
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks all
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Don
1) Please mention the config setting made at copy inspection lot setting. some thing might be missing
2) Please make sure that the sample size of the copying lot and to be copied lot are same
Regards
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Don
There is good document over this functionality written Shyamal. Kindly check the same and let me know your doubts
Link: [http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/60221c69-0f8b-2b10-eebf-bec51a601dd6]
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.