PPM and PDS

Former Member
0 Kudos

Hi All,

I have PPM and PDS for a location product, How can I control (Except "plan explosion" one in PP/DS tab page of Location product ) wether my SNP run (Heuristic and CTM) to select only PPM in Heuristic and PDS in CTM.

And have two PDS with diffrent validity periods, where I can see which PDS is selected for inhouse receipt.

Thanks in Advance,

Sreerama.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Sreerama,

1) The two areas where the usage of PPM or PDS is defined is

one at the material master in PPDS tab which you have rightly

mentioned

another at the customisation for PPDS.

If the first one is not defined, system uses the value from

customisation.

For usage in CTM or in heuristic, you need to define the

products in such a way clearly bifurcate for ctm & heuristic

and maintain material master accordingly because a single

locaiton production cannot be used both for ctm and heursitic

which cannot be of business importance.

2) Selection of PDS is based on the validity period defined in

the PDS and the priority/cost maintianed in the PDS data.

Regards

R. Senthil Mareeswaran.

Former Member
0 Kudos

Hi,

Thnaks for the Information.

Sreerama

Answers (0)