on 10-29-2009 5:31 PM
Hello,
1. Our Master SLD runs on SMP (Solution Manager) server.
2. We do have also the SMSY on the sames SMP (Solution Manager).
3. Through SAP Standard daily job - LANDSCAPE FETCH (ABAP : RSGET_SMSY), SMP-SMSY is synchronized with SMP-SLD.
But there is an error :
1. In SMD-SLD, I have a system CDT.
2. This system is entered 2 times in the SMP-SLD :
One as CDT as Web AS ABAP and once as Web AS JAVA, which is right.
After the end of LANDSCAPE FETCH job execution, I get 2 entries in SMP-SMSY :
1. CDT
2. CDT_00001
CDT is right, but CDT_00001 is wrong.
Any idea ?
I got the same error for some other systems.
Thanks
PC
Hi,
Check this note
1360590
This should solve your problem.
Feel free to revert back.
-=-Ragu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.