RAR 5.3 - Risk appears in analysis inspite being mitigated

Former Member
0 Kudos

I've mitigated a FI risk (F005) for a role. Now when I run role level risk analysis for that role, still the risk (F005) appears inspite the default setting being yes for "exclude mitigated risks". Am I missing something?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

That is correct, you will have to specify the risk id as F005*.

I had a similar issue which was resolved using the * at the end of the risk Id.

Rgds,

Prevo

Former Member
0 Kudos

This is because although the Risk ID is actually F005, RAR checks the underlying rules which will be generated in the format of F00500101 or the like!

Simon

Answers (2)

Answers (2)

Former Member
0 Kudos

thanks

Former Member
0 Kudos

Hi Partha,

I believe while mitigating the risks give the Risk id as F005* - Then the roles will not be appeared in mitigation.

Thanks and Best Regards,

Srihari.K