Hi,

I have previously worked with GRC 5.2 and have used risk terminator. I am looking into deploying GRC 5.3 but I cannot find any information on risk terminator. Is this tool included in 5.3? If not how has it been replaced?

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Gary,

Yes it's there!

Still in all its glory in the ABAP stack under tcode /virsa/zrtcnfg.

Again, you need to create a TCP/IP RFC and define the Report name, then make the the RAR Connector into an Outbound connection with the same report name and activate the SAP Adapter.

If using it for SPM as well, you also need to define the Connector ID in the SPM Configuration table.

Simon

Edited by: Simon P Persin on Oct 27, 2009 6:05 PM

Former Member
0 Kudos

To add to Simon...there is also a good guide for post installation tasks for SUPM...

https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/6050049b-5d59-2b10-e790-8db133c6...

Cheers !!

Zaheer

Former Member
0 Kudos

Thanks Simon and Zaheer. I found reference to it this morning in some of the configuration documentation it is just not very obvious!.

Thanks for your help,

Gary