0CO_PC_PCP_03 Cost Planning - Can I change the level of itemization?

Former Member
0 Kudos

I want to use the extractor 0CO_PC_PCP_03 to enable me to derive cost extimates. However the standard extractor provides itemization at the very lowest component level, and not at the sub component/assembly level in a BOM.

Is there any way of controlling this with either a config change or an OSS note?

Any help would be much appreciated.

Tim

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

were you able to change the level of itemization in this case for 0co_pc_pcp_03