cancel
Showing results for 
Search instead for 
Did you mean: 

Multiple Dependent sample

Former Member
0 Kudos

Dear QM experts,

Can any one please help me to resolve the issue,

One MIC flollow switching rule of sample management, ie. for example 1MIC total sample size is 200 sample for that we are using Multiple sample ie. Ist will inspect 50 sample and A 0:R 3, if the faliures lies between Accept and reject next 50 samples will be tested, If the failures is with in the Accept limit than discontinue the test.

For that I have created sampling scheme and attached to the sampling procedure, In the sampling procedure i have created new valuation mode supports Attribut inspection and dependent multiple sample. The sampling procedure was attached to the MIC in inspection plan. While doing results recording if the Ist 50 samples failures lies between accept and reject, The status of the inspection character is changed to "2" but i didn't get the next sample ie. next 50 samples i need to do results recording.

Any one please help me to resolve the above.

Thanks,

krish

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member186399
Active Contributor
0 Kudos

Dear Krish

I would request you to first check the same with standard valuations

1) In sampling procedure

Use type : sampling scheme

Mode ; 100, attributine inspection non conf units

select : Dependent Sampling

Make sure that the valuation rule is 66

2) In sampling scheme selecte attribute inspection

if still its not working kindly send in me the screen shot . ID is in my business card

Regards

Gajesh

Former Member
0 Kudos

Hi Krish,

Gajesh is absolutely correct. Kindly check the data he has asked you to check.

[For better clarity go through the post posted earlier by him only|;

Regards,

Shyamal

former_member186399
Active Contributor
0 Kudos

Dear Krish

Have you maintained C2 / D2 , C3/ D3 for the same sample size . You can have up to 7 multiple samples. to get the multiple samples you need to maintain the above.

Regards

Gajesh

Former Member
0 Kudos

Hi Gajesh,

Thanks for your reply.

I have maintained C2/D2 upto 5 level maintained as

Lot size sample size C1 D1 C2 D2 C3 D3 C4 D4 C5 D5

150000 50 0 3 0 3 1 4 2 5 4 5

Kindly advice.

Thanks,

krish