on 10-26-2009 4:12 PM
Hello,
Is there a way to prevent/exclude un-restericted stock from being a part of the net requirement change planning. We use planning with final assembly strategy and naturally the un-restricted stock is not an availbe option to uncheck.
We don't want our un-restrcited stock to be consumed by independent requirements
Thx
Hi Vishy,
You can create a separate category and category group in customisation of
APO (spro) and exclude the ATP categories for unrestriced stock and then
try carrying out net change planning
This will resolve your issue
Please confirm
Regards
R. Senthil Mareeswaran.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Senthil, Julien, Pavan, Saradha,
I did create a new Cat grp and included the new ATP category which doesn't contain CC stock anymore. I then created a PIR awhich came acorss into APO and got netted out by existing stock. .
Is this solution even acheivable in in PP/DS?
Advance thanks to all.
Thx
Hi,
The other simple option would be to stop the Stock being transferred to APO via CIF. If you don't have an active integration model for stocks, they won't be available in APO.
Regards,
Senthilrajan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Saradha,
Thanks for teh feedback. I will try that option for a test but looks little scary. I don't want my little requirement to produce major issues in the system. But I will try it anyway.
Senthil, I do want to see stock info in APO, so excluding thme from active CIF models is not an option.
Thx
Hi Vishy,
Instead of changing the standard category group you can create your own category group which should be the copy of ST1 but exclude CC from it. Then assign this Z category group to your key figure.
This way, we are not changing the standard category group and hence impact will be zero. And you do not have to change the macro as well.
Hope this help
Pavan Sarda
Hi ,
In general the stock will show up in the initial bucket of your planning book. If you do not want unrestricted stock to be considered by planning , then go to category group ST1 in SPRO and remove the category "CC" from the category group. That way unrestricted stock will not be considered by planning.
But you have to be extremely careful when doing this because once you eliminate category "CC" from ST1 , it is going to impact all materials that are SNP planned. So if there are materials for which unrestricted stock has to be included in planning then planning is going to gice incorrect results for them.
Thanks
Saradha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.