insp lot status crtd

raju_123
Participant
0 Kudos

Hi, i have activated 01 insp in mat master. auto asignment is ticked, 100% insp specified. after gr, in qa32 shows the status of the insp lot as crtd. i want rel satus. for that i opend the insp lot, getting the message that specifications not yet assigned. what could be the reason. please advise. please note that i have created insp plan with qp01 for this material also.

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Raju

Make sure that the usage mentioned in the inspection type and used in the inspection plan are same.

Config > QM > Quality inspection > inspection lot creation > maintain inspection type

Regards

Gajesh

Answers (1)

Answers (1)

Former Member
0 Kudos

Check the Status of Inspection PLan Created for this Material..it should be Released (General)