10-21-2009 7:41 AM
Hi,
I need help with transaction EL40. Any documentation would be useful.
Basically I have created few installations with multiple devices attached to it. Now I need to assign street root sequence for those devices so that it will update entries in table ELWEG. It would be of great help if you provide me complete steps to maintain street root for particular MRU (including adding new device/modifying/deleting).
-
Kind Regards,
Nikhil J.
10-21-2009 10:35 AM
Please go through the documentation available at help.sap.
Prerequisites
Installations and corresponding devices have been allocated to the meter reading unit.
IMG PATH:
Device management ® Meter reading ® Meter Reading Organization ® Street route. Enter a meter reading unit and choose Street route ® Maintain.
Note
If you want to specify a shared street route for several meter reading units, enter the main meter reading unit.
The Maintain street route dialog box appears. On this screen, all devices are under the top node Devices not allocated to a street route.
3. Allocate all devices from the top node to the bottom node Devices allocated to the street route.
4. To change the route or to allocate devices to a route:
1. Select either an object, a node or a block.
2. Position your cursor on the item selected.
3. Choose Edit ®
Reassign.
4. Save the street route.