03 In-process inspection

raju_123
Participant
0 Kudos

Hi, i have assigned 03 inspection type in material master. created and released prod order with that material in which we have 3 operations with control key qm04. confirmation will be done for operation 10. results recording will be done for peration 10. next confirmation will be done for opration 20, results recoring will be done for operation 20 and so on. at last operation, after results recording and ud will be done. is it the correct procedure with 03 inspection. or do we need to do ud after completion of each opertion after rrecording? please advise.

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Raju

You are correct. Please find my inputs

1) IN 03 inspection you can do result recording and confirmation together.

2) UD has to be given once all the confirmation is over. UD is for the lot so operation wise UD anway is not possible

Regards

Gajesh

raju_123
Participant
0 Kudos

Thanks a lot.