Hello SAP Gurus,

I have defined a Dynamic Modification Rule a Sampling Scheme and a Sampling Procedure to use in inspection plan.

Everything is working fine but the Sample Size is always 0. In Results Recording (QA32) the inspection lot quantity and number os the materials to inspect is correct... but the sample size is 0! The sample size shoud be equal to the number of the materials to inspect, right?

Heres is a picture of the sampling scheme:

[http://picasaweb.google.pt/lh/photo/5sVXnGLRTCHgHU4Koionzw?feat=directlink]

Here is the link for the inspection lot:

[http://picasaweb.google.pt/lh/photo/8veDwWC-lwE20o0w-qeTEQ?feat=directlink]

The inspection lot is for 10 UN so, acording to the sampling scheme, the sample is 3 UN.... but the sample field is 0.

In the results recording is OK, here is an image:

[http://picasaweb.google.pt/lh/photo/zH-_DjwFlDbw7iXJZXwXEA?feat=directlink]

Thanks in advance,

Adelmo Silva

Edited by: Adelmo Silva on Oct 19, 2009 5:45 PM

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Thank you all for the replies.

I dont need this process anymore.

Former Member
0 Kudos

Hi

Have you maitanied the DMR & sampling procedure relation.

Also have you used seviarity & AQL level same in DMR & SP

also check the charectoristic is " Required char" & not optinal char in the task lsit

Sujit

Former Member
0 Kudos

Hello SujitSND,

The characteristic is mandatory and I have maintained the relation between Sampling Procedure and Dynamic Mod. Rule and still not working...

I dont undestand what you mean by "Also have you used seviarity & AQL level same in DMR & SP"

Thanks,