Hi,

I want to create Inspection Lot for Repetitive Manufacturing But in MFPR it is giving Red Flag and error "Check parallel to production not active for RS header". I have created REM profile and all master data of material. How can I be able to create a lot for In Process inspection?

Best Regards,

Ibne Khalil

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

check the following:

1.Inspection type 03 is active,

2.check BOM is active.

3.check rauting is released.

4.check cost collector for material is working fine.

Revert back

Regards

Sujit

Answers (1)

Answers (1)

Former Member
0 Kudos

In Material Master the Inspection Type 13 was missing. I inserted it and now its working fine.