Hello everyone,
I have a problem, I change a control indicators of characteristic in the inspection plan, but it doesn't take effect.
whether I need to set other setting? Thanks in advance.
zhigang
Edited by: zhigang lu on Oct 16, 2009 5:29 AM
Hello
If the mic is complete or incomplete copy model any changes done in the mic will not be effecting the inspection plan. you will have to go to inspection plan and again update the mic there in the inspection plan
If you use Reference MIC then the changes done in MIC will be updated throughout the inspection plan
Regards
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Thank your answer, I already solved the problem.
After chenged inspection plan, I must reload migo to receive goods, or else new inspection plan can't be effected newly receive the goods.Thanks again.
BR
Zhigang
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please also check under QM client settings in SPRO to ensure that the "replace master inspection characteristics" box is ticked as this will allow changes in the MIC to update the references in the inspection plan. Also check the QM settings at plant level if you have ticked master inspection characteristics with history then if you do a change in the MIC it will create a new version and not update the inspection plans. If this is ticked you will have to manually go into the inspection plan and assign the new MIC version.
Regards,
Roderick
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.