on 10-12-2009 4:27 PM
Hello Team,
Job PLAAP5BULCOD_ISP2_CCR failed due to below reason
Results saved successfully
Step 005 started (program /SAPAPO/CIF_DELTAREPORT3, variant ISP2_NLO_EP, user ID BTCH_ADM)
Background job terminated due to communication error
Job cancelled after system exception ERROR_MESSAGE
Please help me to resolve the issue
Regards
Mohsin M
Edited by: mohsin m on Oct 12, 2009 5:27 PM
Hi mohsin,
ya check if you dump as well. Also check work process trace file from SM50 for the wp on which this jon failed. Check Sm21 as well .. somewhere you will reason for communication error.
And do u have some hint in spool for completed job...e.g ..sometime it says..like some file transfered to another application..
ashish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
That exception most likely created a short dump.. check ST22
Regards
Juan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
ST22 found following eror
The maximum runtime of a program is limited by the system profile
parameter "rdisp/max_wprun_time". The current setting is 1200 seconds. If this
time limit is
exceeded, the system attempts to cancel any running SQL statement or
signals the ABAP processor to stop the running program. Then the system
waits another 60 seconds maximum. If the program is then still active,
the work process is restarted.
Last error logged in SAP kernel
Component............ "NI (network interface)"
Place................ "SAP-Server plsapsid01_SID_01 on host plsapapsid (wp 6)"
Version.............. 38
Error code........... "-10"
Error text........... "partner '127.0.0.1:65000' not reached" Description.......... "NiPConnect"
System call.......... "connect"
Module............... "nixxi.cpp"
Line................. 2513
Hello
I have found same program in st22 for time out SAPAPO/SAPLCIF_DELTA3
User and Transaction
Client.............. 310
User................ "BTCH_ADM"
Transaction......... " "
Call Program........."/SAPAPO/SAPLCIF_DELTA3"
Function Module..... "/SAPAPO/CIF_DELTA3_SEL_FROM_R3"
Call Destination.... "NONE"
Source Server....... "plsapsid00_SID_00"
Source IP Address... "130.144.0.135"
Hi Mohsin,
your job log says
Background job terminated due to communication error
May i ask you to check SM21 at same time .. do you have few communication related entries same time there as well.. also check wp trace file on which this job ran. You may get some clue there as well.
Also if this job was getting completed successfully previously, check that job log .. you may get some hint.
Hope this will help u to check further ..
ashish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I have not found any clue in SM21
PLAAP5BULCOD_ISP2_CCR CTMUSER Finished 04.10.2009 23:30:03 14.858
PLAAP5BULCOD_ISP2_CCR CTMUSER Canceled 02.10.2009 23:30:02 6.217
on 4th oct job was sucesfully completed.....
below is job log for 4th oct
Results saved successfully
Step 005 started (program /SAPAPO/CIF_DELTAREPORT3, variant ISP2_NLO_EP, user ID BTCH_ADM)
Spool request (number 0000022413) created without immediate output
Step 006 started (program /SAPAPO/CIF_DELTAREPORT3, variant ISP2_NLO_SOSTK, user ID BTCH_ADM)
Spool request (number 0000022459) created without immediate output
Results saved successfully
Job finished
can you please help me how to correct with this comparision
Regards
Mohsin M
User | Count |
---|---|
80 | |
24 | |
11 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.