cancel
Showing results for 
Search instead for 
Did you mean: 

Job failed PLAAP5BULCOD_ISP2_CCR

mohsin_m3
Participant
0 Kudos

Hello Team,

Job PLAAP5BULCOD_ISP2_CCR failed due to below reason

Results saved successfully

Step 005 started (program /SAPAPO/CIF_DELTAREPORT3, variant ISP2_NLO_EP, user ID BTCH_ADM)

Background job terminated due to communication error

Job cancelled after system exception ERROR_MESSAGE

Please help me to resolve the issue

Regards

Mohsin M

Edited by: mohsin m on Oct 12, 2009 5:27 PM

Accepted Solutions (0)

Answers (3)

Answers (3)

ashish_vikas
Active Contributor
0 Kudos

Hi mohsin,

ya check if you dump as well. Also check work process trace file from SM50 for the wp on which this jon failed. Check Sm21 as well .. somewhere you will reason for communication error.

And do u have some hint in spool for completed job...e.g ..sometime it says..like some file transfered to another application..

ashish

JPReyes
Active Contributor
0 Kudos

That exception most likely created a short dump.. check ST22

Regards

Juan

mohsin_m3
Participant
0 Kudos

ST22 found following eror

The maximum runtime of a program is limited by the system profile

parameter "rdisp/max_wprun_time". The current setting is 1200 seconds. If this

time limit is

exceeded, the system attempts to cancel any running SQL statement or

signals the ABAP processor to stop the running program. Then the system

waits another 60 seconds maximum. If the program is then still active,

the work process is restarted.

Last error logged in SAP kernel

Component............ "NI (network interface)"

Place................ "SAP-Server plsapsid01_SID_01 on host plsapapsid (wp 6)"

Version.............. 38

Error code........... "-10"

Error text........... "partner '127.0.0.1:65000' not reached" Description.......... "NiPConnect"

System call.......... "connect"

Module............... "nixxi.cpp"

Line................. 2513

JPReyes
Active Contributor
0 Kudos

This error is from a dialog process exceeding the wp runtime.... I'm sure its not related to the background job.

Regards

Juan

mohsin_m3
Participant
0 Kudos

Hello

I have found same program in st22 for time out SAPAPO/SAPLCIF_DELTA3

User and Transaction

Client.............. 310

User................ "BTCH_ADM"

Transaction......... " "

Call Program........."/SAPAPO/SAPLCIF_DELTA3"

Function Module..... "/SAPAPO/CIF_DELTA3_SEL_FROM_R3"

Call Destination.... "NONE"

Source Server....... "plsapsid00_SID_00"

Source IP Address... "130.144.0.135"

ashish_vikas
Active Contributor
0 Kudos

Hi Mohsin,

your job log says

Background job terminated due to communication error

May i ask you to check SM21 at same time .. do you have few communication related entries same time there as well.. also check wp trace file on which this job ran. You may get some clue there as well.

Also if this job was getting completed successfully previously, check that job log .. you may get some hint.

Hope this will help u to check further ..

ashish

mohsin_m3
Participant
0 Kudos

I have not found any clue in SM21

PLAAP5BULCOD_ISP2_CCR CTMUSER Finished 04.10.2009 23:30:03 14.858

PLAAP5BULCOD_ISP2_CCR CTMUSER Canceled 02.10.2009 23:30:02 6.217

on 4th oct job was sucesfully completed.....

below is job log for 4th oct

Results saved successfully

Step 005 started (program /SAPAPO/CIF_DELTAREPORT3, variant ISP2_NLO_EP, user ID BTCH_ADM)

Spool request (number 0000022413) created without immediate output

Step 006 started (program /SAPAPO/CIF_DELTAREPORT3, variant ISP2_NLO_SOSTK, user ID BTCH_ADM)

Spool request (number 0000022459) created without immediate output

Results saved successfully

Job finished

can you please help me how to correct with this comparision

Regards

Mohsin M