on 10-07-2009 4:22 PM
Hi,
can you consider the shelf life in PPDS? and how do you model it?
Thanks in advance
Hello,
PPDS consideres Shelf Life in two locations.. alerts and the Planning of Std Lots with Shelf Life heuristics (SAP_PP_SL001)
Basicacly what it does is create´s a restriction for the dynamic pegging relationship, cutting the pegging if the distance between the requirement and receipt is longer than the shelf life.
In case you want to do this considering stocks as well, you need to cif batches and the following batch characteristics:
LOBM_APO_SL_MIN Min. shelf life/maturation in sec. NUM 15.3
LOBM_APO_SL_MAX Max. shelf life/maturation in sec. NUM 15.3
LOBM_APO_SL_UTC Reference time stamp of the batch NUM 15.0
LOBM_VERAB (Standard characteristic)
LOBM_VFDAT (Standard characteristic)
LOBM_HSDAT (Standard characteristic)
for more info, Note 751392 - Shelf life R/3 -> APO: Settings in R/3
good luck.
Rafael
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.