When I am creating inspection plan with multiple specification, I am facing an error
"No valid material-routing allocation exists for XYZ material".
This is happening when I am trying to select Dependant Characteristic Specification. I went to that tab and entered, Material, Object and Object type. Could anyone tell me what exactly is missing here.
Thanks
Vineeth varghese
done. thx
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
can you please elaborate the steps you are following.
Depent multiple specs are entered in a task list after proper assignment of vendor & material .
please follow steps
To incorporate these scenarios in SAP do following steps;
Step: 01. Create an inspection plan; initially take any one as the specification limit for Length.
Step: 02. Assign material and all three vendors to the task list group counter.
Step: 03. Go to characteristic over view screen, select the MIC attached and click on the DEPENDENT CHARECTERISTIC button .
Step: 04. System will populat a new screen. In this screen system will allow you to enter vendor wise different specification limits to a single MIC.
Step: 05. Whenever the GR will be posted for the vendor. Lot will be generated and the relevant limits will be read by the system at time if result recording.
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Sujith,
It was due to a small mistake from my side. In the "dependant characteristc specs general" tab instead of chossing drop dowm nenu, I manually populated material field, so the other corresponding fields in that tab didnt got populated. Once I used drop down functionality, it worked.
Next issue which am facing is I created inspection plan and assigned 01 inspn type in mat master. But this plan is not getting assigned to inspn lot. I checked, 01 inspn type active, assign task list check box, multiple spec in material master. Usage 5 and release indicator 4 for inspection plan with correct key date. In material assignment I assigned object type 01 (country). Erro "No inspection plan found" is showing here.
Thanks,
Vineeth
Edited by: Vineeth Varghese on Oct 12, 2009 7:09 AM
In Material assignment, I am not able to asssign vendor. Its showing error, when I try to asisgn vendor. But there is no issue in assigning customer and objects. Also when I tried to create inspection lot my manual lot creation also, inspection plan is not getting assigned to inspection lot. If any one came across these scenario, pls help me. Early replies are appreciated.
Hi
--> I have 2 supplying plants, and 1 receiving plant ( one material code)
--> Maintain inspection plan for supplying plant as vendor for both the plants
--> When transfer the from suppluing plant to receiving plant as STO , lot is created with inspection type '08' but not attached the task list for supplying plant spect( maintained in receiving plant).
--> If ony supplying plant is there then there is no problem by default it is considered first group counter (5/4)
--> please adivse me how to handle for multiple vendors/supplying plant with 2 group counters( 5/4 is same in inspection plant)
Advance thanks
please help