Inspection Lot creation

Former Member
0 Kudos

Inspection type 01 is activated for the material. At the time of creating a GRN, we are creating a GRN with 100 numbers of batches against one GRN. System is creating 100 insoection lots, each inspection lot per batch. Now we want that system should create a inspection lot for 20 batch numbers only though the GRN contains 100 batches ( One inspection lot per batch). Is it possoble? How?

Thanks,

Sachin

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

if you only want to create a lot for 20 batches then you have to create a GR of only 20 nos

& select Qm view-->Control InspLot you have selected for each material document,material ,batches

if you have material document of 100 the 100 will be created....so better you split the requirement

this is only the solution

Regards

Sujit

Former Member
0 Kudos

One GRN conatins 100 batches and I wnat ti inspect 20 batches means 20% only. How to map this?

Former Member
0 Kudos

As I told you earlier

This is only possible if split the batches so as GRN