on 10-01-2009 6:22 AM
Dear Expert...
We do the forecast based material Planning....
How to do the default setting for the created SO without material planning..
There is a option in schedule line. to select the no material planning... But I need to set this option as default.
without chaging the material master...
Hi Ram,
The data that is pulled in a sales order is coming either from the default config set in sales order customisation (vov8) or through the master datas.
When you are using forecast based planning u have to set in MMR>MRP1 tab as VV and in case u dont want to use any material planning u have to set in there parameter as ND.
As far as ur question is concerned i dont think that without setting anything in master datas u would b able to get the desired results, the info in sales order schedule line is pulled fro there only , u cant change there directly i believe.
In vov8 u can leave the MRP for delvry scheduling type blank which means no delivery schedules used but in case u are using any forecast or JIT based planning then u have to use some req planning and set the corrosponding parameter in MMR>MRP1 tab.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.