Hi,

I have scheduled multiple batch jobs , it is starting and completion successully with out any issues. But the job not starting at scheduled time which taking some delay time to start. For example

1. I have increased 5 BGD process instance profile - we have scheduled 5 jobs at 7.00PM but job starting at 7.00.20( 20 sec delay)

2. 10 BGD process - scheduled 10 jobs 8.00.00PM but starting at 8.00.35 ( 35 seconds delay)

3. 15 BGD process - scheduled 10 jobs 9.00.00PM but starting at 9.00.50 ( 50 seconds delay)

Also for complete taking long time if i increase process.

Please suggest why this is happening.

Thanks,

Chimsik

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

HI

If you are sure that you have enogh free BGD process check the parameter rdisp/btctime ( This parameter specifies the intervals at which the periodic

background scheduler runs.). The time intervel between two job scheduler run can result in delays when starting a job. The defailut value for this parameter will be 60 sec.

You can also look OSS notes 636855 and 37104

Thanks

Prince Jose