Hi,
I have scheduled multiple batch jobs , it is starting and completion successully with out any issues. But the job not starting at scheduled time which taking some delay time to start. For example
1. I have increased 5 BGD process instance profile - we have scheduled 5 jobs at 7.00PM but job starting at 7.00.20( 20 sec delay)
2. 10 BGD process - scheduled 10 jobs 8.00.00PM but starting at 8.00.35 ( 35 seconds delay)
3. 15 BGD process - scheduled 10 jobs 9.00.00PM but starting at 9.00.50 ( 50 seconds delay)
Also for complete taking long time if i increase process.
Please suggest why this is happening.
Thanks,
Chimsik
HI
If you are sure that you have enogh free BGD process check the parameter rdisp/btctime ( This parameter specifies the intervals at which the periodic
background scheduler runs.). The time intervel between two job scheduler run can result in delays when starting a job. The defailut value for this parameter will be 60 sec.
You can also look OSS notes 636855 and 37104
Thanks
Prince Jose
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.