cancel
Showing results for 
Search instead for 
Did you mean: 

Inspection type

Former Member
0 Kudos

Hai gurus,

1) I wnat to know what is the basic settings ( check boxes) to be activated for Inspection type 01,in Materai Master when I am doing GI of raw material , during that time inspection lot to be created and i want to do only UD accept or reject with qty

and not any result recording.

2) In the same i want to know the check boxes to be active in material master for Inspection type 04( goods receipt)

waiting for the positive reply.

regards,

sekar chand

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Inspection type 01:

Active

Post to Inspection

Enter sampling procedure

Tick on Auto UD & Skip allowed.

Do not tick on Task list if you do not want to RR

Inspection type 04:

Active

Post to Inspection

Enter sampling procedure

Tick on Auto UD & Skip allowed.

Do not tick on Task list if you do not want to RR

Sujit

Answers (0)