on 09-22-2009 9:43 AM
Hai gurus,
1) I wnat to know what is the basic settings ( check boxes) to be activated for Inspection type 01,in Materai Master when I am doing GI of raw material , during that time inspection lot to be created and i want to do only UD accept or reject with qty
and not any result recording.
2) In the same i want to know the check boxes to be active in material master for Inspection type 04( goods receipt)
waiting for the positive reply.
regards,
sekar chand
Hi
Inspection type 01:
Active
Post to Inspection
Enter sampling procedure
Tick on Auto UD & Skip allowed.
Do not tick on Task list if you do not want to RR
Inspection type 04:
Active
Post to Inspection
Enter sampling procedure
Tick on Auto UD & Skip allowed.
Do not tick on Task list if you do not want to RR
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.