MM - Mass maintenance MM17

Former Member
0 Kudos

Hi gurus !!

I have to extend about 2500 materials from plant "xxx" to plant "yyy", somebody can explain to me how is the procedure, I mean step by step, because I can not do it work.

I really appreciate a handbook for trx. MM17.

Thanks a lot !!

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

If you have very few material to extend then you can use MM01 tcode

If you have some material to extend then you can use MM17 tcode

if you have many material to extend then you can use standard LSMW object or Bapi.

Answers (6)

Answers (6)

Former Member
0 Kudos

This message was moderated.

Former Member
0 Kudos

Use SCAT to extend all material from plant xxx to yyy.

Vijay

Former Member
0 Kudos

LSMW is the better option than MM17

Former Member
0 Kudos

hi

as there is no combination of MARC-WERKS in MM17, as per my knowledge we cant extend the material to other plant through mass maintenance. a readymade badi is also available for the same. pls try over it.

ujwal

Former Member
0 Kudos

Thank you very much for your help, can you tell me the badi you´re talking about ?

Regards.

BijayKumarBarik
Active Contributor
0 Kudos

Hi,

Use LSMW to extend the materials from one plant "xxx" to another plant "yyy" with t.code MM01 or MMZ1 (for used material).

For more check the links:

http://e-mory.blogspot.com/2008/02/sap-lsmw-concept.html

http://sapbrainsonline.com/TOOLS/LSMW/SAP_LSMW_steps_introduction.html

Regards,

Biju K

Former Member
0 Kudos

Hi

Try to use LSMW to extend the materials from one plant to another plant.

Check sap technical com for more info.

Thanks/Karthik