cancel
Showing results for 
Search instead for 
Did you mean: 

Evaluation System

Former Member
0 Kudos

Hi All ,

I have created project and assigned the logical component which includes 3 systems with DEV, Test and Prod roles .

When I define a Business Blueprint in SOLAR01 it opens by default a project with an "evaluation system" role.

My question is which one of the systems in my system landscape supposed to be an evaluation system, Dev , Test or Prod ?

What is the best practice ?

I know that is Evaluation system is designed for Business Blueprint phase , but what is really meaning ?

Cheers ,

Evgeny

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi all,

I've had the same issue with regards to getting the error below when assigning transactions to a Blueprint business process.

"No system found for component and Evaluation system in the Project"

But I think I have solved it and seems pretty simple to change the system role from Evaluation System to any other that is relevant in your landscape.

Go to transaction SOLAR01 > Click on the first level of the Project Name (Under Business Blueprint Structure) to select the Project.

Click Business Blueprint in the Menu > System Role > Choose the relevant System Role (in my case Development)

Click Copy

This should replicate to all nodes and then you should be able to assign transaction to the business processes.

Quite strange and seems simple, I checked the Solution Directory, Solar Project Admin etc etc but couldn't find the solution until this which should work.

If not, there is a similar work around which also works.

Go to transaction SOLAR_PROJECT_ADMIN

System Landsacpe Tab

Systems subtab

Click System Role Assignment

Remove the Evaluation System (or all those not relevant to your Project and Logical Components)

Save Project

Go to SOLAR01 and it should reflect it in the Blueprint.

You can always go back to this and add the System Roles you removed and the Blueprint will reference the correct Role.

Hope this helps everyone,

-Rohan

Former Member
0 Kudos

Hi ,

That's right , but I would want to clarify my question .

I have physically 3 systems (DEV, TEST , PROD ) and I have assigned them to the logical component with proper roles

When I create a project I need to assign logical component to the project .

After , when I assign transaction and logical component to the business process (in solar01) I get the error" No system found for component and role Evaluation system in Project ". And that's , as I understand , because solar01 always opens by default the System Role " Evaluation System".

So that , my question is which one of my systems I am choosing to be (logically) an evaluation system ?

Cheers ,

Evgeny

Former Member
0 Kudos

Hi Evgeny Fridlis ,

Even im also facing the same - But i dont have 3 sytem - i have only 1 system i.e PRD system and im facing the same problem in it. How you have came out from this situation. Please let me know - i have stuck up over here , its an production issue with importance. Do the needful. Thanks in advance.

Amrita

Former Member
0 Kudos

Evaluation System is not an SAP term but rather a generic term.

Evaluation System imply the step before Training System.

I would see this as a sandbox like defintion.