cancel
Showing results for 
Search instead for 
Did you mean: 

DMS queries

Former Member
0 Kudos

1. document attched at materail master, doesnt flow to PR for the material..................

2. document attcahed at BOM (header level, item level), is not flowing to Production order

3. document attched to material master is flowing to production order (strange)

4. document attched to BOM, when we run MRP ................PR is not carrying the document

Y so?

Any user exits available for these..........

any setting to make these possible?

Regards

SURYA

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

pls check whthr u have configured correct object links for all the doc types u r using to create documents in dc10.

Thank You,

Manoj

Former Member
0 Kudos

doc are being attached at individual levels.............

i am talking about the flow

Regards

SURYA

Makal
Active Contributor
0 Kudos

Object links for all doc types has been defined properly in the DC10.

What Surya & myself are looking at is, document flow.

Say I have a material "XYZ" & in the material master "abc.pdf" is attached.

Now when I create a PR or planned order for this material, I'm expecting that pdf file attached to the material master also to flow to PR & PO (And planned order to production order).

Let us know, what could be missing or what extra items need to be taken care to make things work like what we are expectiing?

Thanks

Makal
Active Contributor
0 Kudos

Even I'm looking for solutions for these qns.

Experts, please throw some light on this.