on 09-14-2009 6:29 AM
1. document attched at materail master, doesnt flow to PR for the material..................
2. document attcahed at BOM (header level, item level), is not flowing to Production order
3. document attched to material master is flowing to production order (strange)
4. document attched to BOM, when we run MRP ................PR is not carrying the document
Y so?
Any user exits available for these..........
any setting to make these possible?
Regards
SURYA
Hi,
pls check whthr u have configured correct object links for all the doc types u r using to create documents in dc10.
Thank You,
Manoj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Object links for all doc types has been defined properly in the DC10.
What Surya & myself are looking at is, document flow.
Say I have a material "XYZ" & in the material master "abc.pdf" is attached.
Now when I create a PR or planned order for this material, I'm expecting that pdf file attached to the material master also to flow to PR & PO (And planned order to production order).
Let us know, what could be missing or what extra items need to be taken care to make things work like what we are expectiing?
Thanks
Even I'm looking for solutions for these qns.
Experts, please throw some light on this.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.