on 09-09-2009 4:23 PM
Hi all ,
I had created a sampling proedure for an inspection plan , but during samples generation by the system they are getting generated for different plants .has Physical Sample determination has any dependency on the plant ?
thanks ,
ksr
Sampling Procedure are independent of plant.
u can use sampling procedure for any plant.
Plz. check inspection plan, May be u have maintained same Sampling procedure for both plants in inspection plan.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
>
> I had created a sampling proedure for an inspection plan , but during samples generation by the system they are getting generated for different plants .has Physical Sample determination has any dependency on the plant ?
Please understand.
SP we can create client wise. Same SP we can use for different inspection plan of diff Plant.
System will create physical sample with reference to inspection lot. If you have assigned same SP to two diff insp plan of two diff. plant (0101 & 0102). When lot for 0101 plant then physical sample would be for 0101 plant & lot for 0102 plant then physical sample would be for 0102 plant.
Hope this helps.
Thanks!!!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.