on 09-09-2009 12:17 PM
Hi Gurus,
I got the error message "Valuation with material cost estimate: error with product" when I tried to create Intercompany invoice.
I checked costing view. Everything seems to be correct).
Detail from the error message:
"In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.
In order to determine the current plan period, the system needs to read the valuation segment of the material master."
I think there is a customizing point missing.
Thank for you help.
Stéphane.
Cost estimated for the current period was not calculated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Stéphane,
Please check in your material master data , the standard cost estimate is marked and released
for the month. The standard cost estimate will get transferred to COPA Segment through a
condition type.
And also check
Price control indicator is V or S. if it is V i.e moving avg price maintain material in transaction KE4H.
Thanks,
Swamy H P
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You may check note 69442
thanks
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.