Error "Valuation with material cost estimate" during Intercompany billing

Former Member
0 Kudos

Hi Gurus,

I got the error message "Valuation with material cost estimate: error with product" when I tried to create Intercompany invoice.

I checked costing view. Everything seems to be correct).

Detail from the error message:

"In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.

In order to determine the current plan period, the system needs to read the valuation segment of the material master."

I think there is a customizing point missing.

Thank for you help.

Stéphane.

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Cost estimated for the current period was not calculated.

Former Member
0 Kudos

Hi Stéphane,

Please check in your material master data , the standard cost estimate is marked and released

for the month. The standard cost estimate will get transferred to COPA Segment through a

condition type.

And also check

Price control indicator is V or S. if it is V i.e moving avg price maintain material in transaction KE4H.

Thanks,

Swamy H P

Lakshmipathi
Active Contributor
0 Kudos

You may check note 69442

thanks