cancel
Showing results for 
Search instead for 
Did you mean: 

moving to ehp1 for PI 7.0

Former Member
0 Kudos

Hi,

I have EP and PI 7.0 on the same box...

for some EP functionality the requirement is to move to ehp1...

can anyone pls suggest what changes I have to do in PI?...

I have the PI system up and running , with upgrade of ABAp stack..do i have check out for ne particular changes?

will it effect PI?

thnks in advance for ur replies

Accepted Solutions (1)

Accepted Solutions (1)

agasthuri_doss
Active Contributor
0 Kudos

Teja,

After upgrading to PI 7.1

  • All objects in the Integration Repository (IR - Design) are available in the Enterprise SOA Repository (ESR) and can be used without any changes.

  • The Integration Directory (ID - Configuration) will not be affected at all

  • Mappings (graphical mapping, XSLT, Java mapping and ABAP mapping) will execute without any change

The Changes required for / after migrating to PI 7.1 from PI 7.0

  • Need to Migrate System to 64 bit OS before upgrade PI 7.1 will not support 32 bit OS

  • Customer Adapters and Adapter modules have to be adjusted and redeployed

  • Java Proxies have to be redeployed because JAVA JVM is installed during upgrade and JAVA JDK not supported at all in PI 7.1

Cheers

Agasthuri

former_member200962
Active Contributor
0 Kudos
After upgrading to PI 7.1 

Upgrade details required for SAP PI7.0 to EHP1 of SAP PI7.0

Thanks,

Abhishek.

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Refer SAP Note : SAP Note 1169247 u2013 Upgrading to EHP1

SAP Note 822380 - Problems w/ add-on inst/upgrade to SAP NW 7.0 AS ABAP

Thanks

Swarup

Former Member
0 Kudos