on 09-05-2009 1:27 AM
Hi,
I have EP and PI 7.0 on the same box...
for some EP functionality the requirement is to move to ehp1...
can anyone pls suggest what changes I have to do in PI?...
I have the PI system up and running , with upgrade of ABAp stack..do i have check out for ne particular changes?
will it effect PI?
thnks in advance for ur replies
Teja,
After upgrading to PI 7.1
All objects in the Integration Repository (IR - Design) are available in the Enterprise SOA Repository (ESR) and can be used without any changes.
The Integration Directory (ID - Configuration) will not be affected at all
Mappings (graphical mapping, XSLT, Java mapping and ABAP mapping) will execute without any change
The Changes required for / after migrating to PI 7.1 from PI 7.0
Need to Migrate System to 64 bit OS before upgrade PI 7.1 will not support 32 bit OS
Customer Adapters and Adapter modules have to be adjusted and redeployed
Java Proxies have to be redeployed because JAVA JVM is installed during upgrade and JAVA JDK not supported at all in PI 7.1
Cheers
Agasthuri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Refer SAP Note : SAP Note 1169247 u2013 Upgrading to EHP1
SAP Note 822380 - Problems w/ add-on inst/upgrade to SAP NW 7.0 AS ABAP
Thanks
Swarup
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.