on 09-03-2009 9:47 AM
Hi,
I want to test the functionality of the new feature of PI 7.1 EHP 1 SOAP adapter supported communication directly with ABAP Proxy.
My Scenario is :
ECC A -
> AAE (SOAP XI 3.0) SENDER -
> AAE (SOAP XI 3.0) RECEIVER -
> ECC B.
is that can be done ? if yes why the message from ECC A always goes to PI Integration Engine in stead of directly to Sender AAE ?
How to configure that ?
Thank You and Best Regards
Fernand Lesmana
Finally, the solution has been provided by SAP in this link http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/70066f78-7794-2c10-2e8c-cb967cef407b&override...
Thank You SAP Teams.
Best Regards.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
have you use the SOAP adapter or XI adapter (proxy)?
note that XI adapter is not supported for the AEE if you are below EHP1.
for configuration: https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/700058f0-b1a1-2a10-39a8-ab2627b8...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.