NW EHP1 7.1 Java Stack Installation error on Phase 33 of 36

Former Member
0 Kudos

I am installing SAP Netweaver 7.1 EHP1 Application Server instance (Java Stack only) . I am getting an error on Phase

33 of 36 i.e Prepare to install minimal configuration phase. The error

is:

Java processes of instance SBX/JCOO [Java:UNKNOWN] did not reach state

PARTUNNING after 20-30 minutes. Giving up.

WARNING[E] 2009-08-31 00:08:42.437

CJS-30150 Java processes of instance SBX/JC00 [Java: UNKNOWN] did not

reach state PARTRUNNING after 20:30 minutes. Giving up.

ERROR 2009-08-31 00:08:42.546

FCO-00011 The step startJava with step key

|NW_Standalone_Java_Units|ind|ind|ind|ind|0|0|NW_Java_Units_Standalone|ind|ind|ind|ind|1|0|SAP_Software_Features_Configuration|ind|ind|ind|ind|4|0|NW_Call_Offline_CTC|ind|ind|ind|ind|7|0|startJava was executed with

status ERROR .

These same above got in steps phase Start Java Engine. But I adjusted the heap size from configuration then installation phases pass through. Now same error is on last phase 33 of 36.

Please advise ...

Thanks & Regards

Ak

PS: System Details:

Windows 2003 Server Standard Edition R2 SP2 [32-bit]

MS SQL Server 2008

RAM 2GB

The sap installation components are : AS java

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

The issue has been resolved by changing the max heap size from 1024 to 256 Installation completed successfully.

Former Member
0 Kudos

Ak,

Please go through the troubleshooting guide. You will find notes regarding adjusting parameters and log/trace files to check.

[https://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/e09e4a5e-8280-2a10-ca98-a59dd47d396d&overridelayout=true]

Also, adjust your swap space to 3 to 4 times of RAM if it is not already done.

Hope this helps.