i have encountered an error in process on my confirmation but it is already approved
it was push at SE37 with bbp_pd_conf_transfer & BBP_PD_CONF_TRANSFER_V2 but there's no changes at the confirmation at the SRM and no error appears at the application monitor
how could i resolve this? many thanks
hi chean
check we02 mbgmcr01 idoc in both system for that error date in srm as well as ecc.
it will inform you why gr was not able to post in the back end. correct the data via bd87 and post them
br
muthu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
you can try this also.
1) Check confirmation application monitor error what is the cause
2) Check BBP_PD Error Message
3) Execute the FM (BBP_PD_CONF_TRANSFER_V2) for the error confirmation in SRM and after execute a IDoc will generate (Failed) Iodc
4) Check related Idoc in WE02 or BD87 and re-process
5) Check related confirmation in R/3 and SRM
Regds,
jai