on 08-21-2009 9:27 AM
I have created a BOM for SD orders. the main item and the sub-item is assigned to different shipping points because the "loading group" is different in material master data. I want the sub-item to have the same shipping point as the main item in case it is ordered as a set. but there are cases that the sub-item is ordered seperately, in this case material should have the shipping point defined in the material master data.
Is it possible in standart? or should I do it with a user exit in the order?
Hi
It is not pssible in standard functionality, you need to work with user exit only.
Cheers
Chandra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.