on 08-20-2009 2:25 PM
What way we can allow the system to update the Material availabilty date to be entered less than the server date. In order to push my Legacy orders in the system, I need the system to allow the Material Availabilty date field to be allowed to have the date in the past.
In standard Sap ecc6 its not allowing to do so.
In MB1C with movement type 561, you have the option of "Posting Date" where you can maintain the past date. But there also, you can maintain a date of previous month provided MM Period is open.
thanks
G. Lakshmipathi