Hi sap gurus,

My client requirement is dmr at characterstic level.

SPRO i set the dmr level 1 and 3. inspection plan header level selected as dmr at characteristic level, inspection characteristic assigned with dmr.

Dmr created that 1 st stage no.of insp;1, next stage 2 and second stage no.of skips 2 next stage 1 both accepted or rejected.

But mic is not skiping. Kindly tell me where is the problem.

Rgds,

Krishna

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

is DMR created with UD or Lot level?

if it is UD level that means you have to take UD of the lot you have created & close the char (status 5) so that next time status will be skip for a mic(status:4)

please revert back

Regards

Sujit

Former Member
0 Kudos

Hi sujith,

I have created at lot level. But it is working in development client. But it is not working in Testing client. Master data and configuration is same for both the clients. I think some sap notes missing. Please give me DMR sap notes

Regds,

Krishna

Former Member
0 Kudos

hi

in client level setting SPRO-->basic setting -->client level

maintain

Valn rule for lot-based dyn.mod. QDQL_U_D_WORST_CASE

& check

Regards

Sujit

Former Member
0 Kudos

Hi Sujit,

This function module (QDQL_U_D_WORST_CASE) already assigned to the system

Regds,

Krishna