Hi

Is there any way by which we can skip lots for production confirmation.

The qty for e.g. is 10, production confirmation will be done for 2, 3, 4, 1. The inspection will be done only when the total qty is 10 and continued.

The requirement is to skip the lots till a particular quantity has been confirmed by production.

can this be addressed through DMR?

Kindly help

Thanks

Prahlad

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member186399
Active Contributor
0 Kudos

dear Prahlad

DMR is not going to help as it based on the lot and not on the inspection point. Let us check for some other options