on 08-18-2009 1:03 PM
Hi Experts,
Can Anybody tell how to use the msprojects,i.e., how import data from project to the msproject, cproject & wht is the diffrence between them.
Thanks & regards
Raman T S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
actually there are two SAP Products:
(1) SAP Project System (PS)
(2) SAP cProjects
The SAP Project System uses the already mentioned Open PS interface ((OpenPS4MSP; see note 579761 (FAQ)) . It can be downloaded via [http://service.sap.com/instguides] -> SAP Business Suite Applications SAP Open PS.
The SAP cProjects does have its own MSP interface shared with SAP Portfolio and Project Management (RPM4.0, RPM4.5).
Kind regards
Peter
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can use MS projects data imported to SAP through an interface called Open PS interface provided by SAP.
It is mainly used to exchange data on scheduling, structures and resources between SAP PS and MS Projects. Other relevant datas can also be exchanged during the import.
Open PS interface can be downloaded from various SAP websites.
Regards,
Kabir
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.