on 08-18-2009 8:55 AM
Can any body tell Right solution
1)I created dynamic modification:
i) Iin dynamic modification i assign radio button usage decision level
ii)reset period 1
iii)stage 1 ins 004 ist X details no inspection 1 new inspection stage 99, rejection 1,new inspection stage
iv)ok
no of skips 98, duration 5 new insepction stage 99
if not ok
rejections 1 , new inspection stage 1.
i created dynamic modification rule ( my requirement is one inspection lot for daily against vendor)
2) in material master i assignmed dynamic modification rule and tick the check box skip allowed
3) in quality plan header i maintained dynamic modificiation lot level
now i will do gr one purchase order against 10 recipts
system generate 10 lots ,that first lot i have to assign specification and sample and give the result and give usage decision.
and second inspection lot while i am assign the sample system suggest lot is skip but direct posting will do in usage decision.
my query is i want only one inspection lot against material for particular date & material only i post to quantity first lot
remaining lot i dont what to post manually.
if it is possible in standards give ur valuble soloution .................I will appriciate those guys.
Hi
In short as you have specified the reset period as 1 day,.......
System will reset the DMR Every day.
Now suppose 10 lots created.you only want to Inspect first lot.rest should be skipped.(auto UD)
then whatever setting you have done ,addition to that
maintain:
1.QA16 create varient
2.QA17 schedule it for say 1 hr.
3.in plant level enter maximum skip duration & UD period as 1 hrs.
4.click on Auto UD & skip in QM view.
After these settings first lot will come in QI stock & rest will be Auto UD in a day.
I hope this will help
Regards
Sujit S Gujar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank u for responding,
Actual my requirement is one material like Indian coal i have 12 Vendors that vendors have different source and different transporters.
in system i want against vendor particular material one inspection in hole day ....if it is possible give me solution.... i am waiting for u valuble suggetion.
Remaining the qa17 and qa16 working fine
but i cont get vendorwise one inspection lot for particular material.
i also assigned vendors in quality plan.... in quality plan material assignment i assigned the material and vendor combination.
hi
i cont get vendor wise one inspection lot for particular material.
i also assigned vendors in quality plan.... in quality plan material assignment i assigned the material and vendor combination.
this may be because of you have put all the vendors in one task list with same group counter.
if you have to do it for all different vendor just check the possibility of using 10 gr counter with 10 different vendors.
this will add some value.
Regards
Sujit
i will give Revert back
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.