I have two back hand systems of R/3 in COMMPRO1.
I want to change my backhand system(that is s ource system) how to do so.
Parag
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Parag
COMMPR01 is the t-code and it does not contain any backend system info.It only contains Category and Hierarchy IDs.
Do you mean to say COMM_PRODUCT table??
If that is the case, you cannot change logsys field. Because that field refers to the backend system from where you replicated materisl.
If you feel that material should come from different backend system then delete the existing material and replicate the new material from the backend system which you want to be.
For this you need to set up the replication procedure for the new backend system.
P.S. -- Do reward points to the helpful solution.
Thanks
Jagdish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.