on 08-13-2009 7:27 PM
Hi gurus,
working on CIF queues. Looks like a material for a particular plant is not ciffed properly from R/3 to APO
error message: " Dummy pegging area not allowed for this node type" any help is appreciated
Thanks
Pooja
Hello,
Which Release/Version you are working on for SCM and SAP R/3?
are you on SCM 7.0 and ECC 6.0?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Pooja,
In general this returncode is a error of:
A dummy pegarea, i.e. a pegarea with key NULL_GUID, may only be specified for I/O nodes of type gc_om_phantom_assembly=1
As a initial step I would request you to follow the attached note 854181,which provides a report to check any inconsistency in the model assignment of all products.
Please run report ZMODEL_PRODUCT_CHECK in your system and check if all products and locations are assigned to planversion 000.
If even after correcting any inconsistencies the problem continues, the next step is to deactivate the BADI /SAPAPO/RRP_SRC_EXIT with the method RRP_USEX_PLORD_CREATE & to re-check the issue.
I hope this helps.
Regards,
Tibor
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Pooja,
Please check on the following
1) R/3 material data whether all MRP fields are maintained and ciffed properly
2) Check in demand tab of /sapapo/mat1 transaction whether pegging data has
been generated for the material and all its components
3) Check the application log generated during transfer
4) Check in transaction /SAPAPO/RRP_NETCH whether the pegging area
available for the item which you are transferring.
Regards
R. Senthil Mareeswaran.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Pooja Challa,
Check if your product location combination exists in APO and it is assigned to active model 000). Also check if any planning run was taken while CIF queue was still running. (not stopped before planning run).
Also refer OSS Note 808998 - R/3-APO: Dummy pegging area for this node type.
BR,
SB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.