In the Value contract SOW Document, if the Target Value (vbap-zwert) is deleted in the second line item, the value is replaced from the first line item.

For example:

Line item 10 has value 1000 USD

Line item 20 has value 2000 USD NET Value = 3000 USD

when the value in the lineitem 20 is deleted and saved the value from the line item 10 is replicated to the second line item.

Line item 10 has value 1000 USD

Line item 20 has value 1000 USD NET Value = 1000 USD

Though the Net value is populated correclty as 1000USD the (zwert)field in line item 20 is populated with 1000 usd and the table is also updated with value 1000.

uable to identify the cause for it, kindly throw some light to resovle this issue.

Regards

Arul.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Standard bug, solution provided by SAP

Jelena
Active Contributor
0 Kudos