on 08-11-2009 5:21 AM
Dear Gurus,
Scenerion is as material is produced though process order it is checked for quality, but some characteristics are checked for long duration. And results are getting after 5-6 days . Uptill that material cant retain in quality lot. So some temperary result has to give for the lot clearance. I want to use Long term inspection functionality in that. So what are the steps to impement and how can i record results once i given UD.
thanks in advance
ACP
Hi
So what are the steps to impement and how can i record results once i given UD.
In a task list there can be many char that can be long term.
You only have to define Long term in control indicator of the char.
Once you define that .......you can do result recording for all the char(including the LT char) & take UD
System then change the status of the lot as LTIN after you take UD.
so when you want to do RR for those char which requie 5-6 days to inspect ..you have to go to the RR-->system will show only those long term char here.& disply msg "char are long term.do you want to inspect"
click on ok & do RR for those char even after UD is taken.
I hope you understood.
Regards
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.