Hello SDN!

I'm going to re-install NWDS 7.0 and before this I want to backup my projects. I have such types of projects as:

- usual java projects

- usual WD projects (not WD DC)

- various types of DC as local DC projects

- java DC porjects connected with a track which has unclosed activities

I know that for usual java projects copying project directories and importing them after re-install will be enough.

Could you tell me please what I should do for backup and restore usual WD projects, my local DCs and DCs connected with a track?

Regards, Lev

Accepted Solutions (0)

Answers (2)

Answers (2)

hofmann
Active Contributor
0 Kudos

Hi,

you can re-install NWDS in another place, like c:\SAP\NEWNWDS. If you start this new version, you can select your previous workplace and all your projects will be imported.

br,

Tobias

Former Member
0 Kudos

hi

generally default workspace fro the neds is C:documents and settings\user \sap\workspace so every project storing there

thn copy tht workspace into someanother location and install the NWDS thn its asking for worksapce

and after tht plcae old workspace into the new workspace.

Thanks