Dear All,

we have activated automatic ud & skipp lot in system but some times material stuck in quality inspection. pl suggest wt to do

Thanks

NKS

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Have u used DMR in the task list or at Inspection type level.

Have you made a backgroung scheduling in QM16 & QM17

Have you maintained plant level setting of Maximum skip duration.

Please revert back

Answers (2)

Answers (2)

Former Member
0 Kudos

Thanks Problem has been solved

NKS

former_member186399
Active Contributor
0 Kudos

Hello

Check whether the back ground scheduling is working properly