on 05-08-2006 5:39 AM
Hi all,
i am having a Cube in BWproduction system which is already in use and now the client has come with a request to add one more infoobject to that already existing cube.
i already have the data in that cube..so if i want to add a infoobject in Dev and then transport that to the Prd will the data existing will be deleted.
and if i add this field to the Datasource will i have to reinitialize from first like delete the old req and then initialize...any options. plz
thanks
neel
Hi Neel,
The deletion of data in production system depends on the nature of infoobject u have to add in the existing infocube.
If the infoobject to be added is a characteristic than you need not to worry about deleting the data, simply u can add it and load the data but you will not have the Historic data for that.
However if you are adding a keyfigure than it is must to delete the data and reload it from scratch.
Hope it helps!!!!
Amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi all,
Thanks for the info
so if i am not worried about the past data so no problem but do i need to do the reinit without datatransfer r else with data transfer
my assumption is that if i am not worried about the past data and keep it the way it is
i can just reinit without datatransfer right.
thanks
neel
hi
so even if i add this field in datasource also i don;t need to do the re init right..jus do the replication and carry on with my normal delta loads.
if yes then how this infoobject will be populated
and is this the same even if its a key figure and i am not worried about the past data
any specific steps if this datasource is from Logistics
like clearing the RSA7 and clearing the extraction queue
please i am very confused and worried as its going to be into production system
thanks and regards
neel
Hi,
u need to flush the Queues in RSA7 and extraction queue
u need to replicate tha data source which u hav customized in to bw. here u need to populate the new objects in bw which u hav added in r/3 and populate them into communication structure.
AS of my knowledge when ur customizing ur data source means u need to delete al the data and reload it after customizing...
-Shreya
hi vishvesh
if i am going to use the loopback process then if i jus do the init without datatransfer will be enough right
becoz i don;t need the data as iam going to get it from loop back if yes
can u tell me do i need to first do the reinit without datatransfer and do the loop back
or else first the loop back and then do the reinit without datatransfer
thanks and regards
neel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Neel,
take a look following doc by Dinesh
if it's a key figure to be added, you need to delete teh entire contents and reload.
if it's a characteristic, you can add it and make changes in the infosource/update rules to populate it.
But you won't have history data for this char.
Hope this helps..
thanks,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.