Net indicator and CO11N

Former Member
0 Kudos

Hello,

if i set the Net Indicator in a BoM material in our example a Phantom for packaging and now i do a confirmation

via the CO11N only a scrap quantity then i see also in the good movements the consumption for the packaging.

But normal i want that the system excluded this automatically, because i only confirm scrap but i don't use eg. the paletes

from the BoM for this scrap.

Can anybody help me?

kind regards,

Bernhard

Accepted Solutions (0)

Answers (1)

Answers (1)

csaba_szommer
Active Contributor
0 Kudos

Hi,

Net indicator (STPO-NETAU) is to exlude the component from asembly scrap calculation:

http://help.sap.com/erp2005_ehp_04/helpdata/EN/ea/e9b3284c7211d189520000e829fbbd/frameset.htm

In certain situations, you do not want the system to calculate assembly scrap for a component in the assembly. You can exclude assembly scrap for this component in the BOM.

In the BOM, you can replace the assembly scrap in the material with operation scrap.

So, component scrap and operation scrap will be calculated for the packaging material - based on your master data settings.

You can read in F1 help for the mentioned field how SAP handles this indicator:

Indicator: Net scrap

This indicator determines whether scrap for the component is calculated

on the basis of the net required quantity (the required quantity without

assembly scrap from the material master record).

Procedure

o You must set this indicator if you want assembly scrap to be

ignored.

o You must set this indicator if you enter operation scrap.

o You can set this indicator if you only enter component scrap, to

calculate scrap on the basis of the net required quantity for the

assembly.

Examples

Bill of material:

o Assembly MAT-1:

- Required quantity 100 pieces

- Assembly scrap 2%

o Component MAT-2:

- Component quantity 100 pieces

Depending on the applicable scrap and the net indicator, the follow

quantities are required for component MAT-2 for a required quantity

100 pieces of MAT-1:

1 2 3 4 5 6

Comp 5% - 5% 5% - -

Op. 6% 6% - - - -

Net ind X X X - - X

Qty 11130 10600 10500 10710 10200 10000

Key

Comp Component scrap

Op. Operation scrap

Net ind Net indicator

Qty Quantity calculated for component MAT-2 in pieces

Regards,

Csaba

Edited by: Csaba Szommer on Jul 28, 2009 7:40 AM

Former Member
0 Kudos

Hello,

thanks for the answer.

but is there a standard process if i confirm scrap via CO11N that i can automaticllay exclude some materials from the BoM?