cancel
Showing results for 
Search instead for 
Did you mean: 

Regarding creation of inspection lot origin-03

Former Member
0 Kudos

Dear all,

The standard behaviour of inspection type 03 is When production order is released inspection lot is created.Client requirement is when particular operation is confirmed only inspection lot to be generated.Is it possible?

For example in routing there are 7 operations and in the sixth operation is Quality audit opeation

inspection lot is created when production order is released, lot is generated but the requirement is when fifth operation is confirmed only lot to be generated.

with regards

kumar

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Senthil Kumar,

AS per best of my information concern your issue can't get resolved with inspection type 03. But yest at time of confirming the Fifth operation you can get the 04 inspection lot triggered by calling the auto GR at this operation confirm by setting the control key at these operation. and these 04 lot can be triggered more than one time for an order.

Regards,

Shyamal

Answers (1)

Answers (1)

former_member186399
Active Contributor
0 Kudos

Dear Senthil

As you said 03 is created at the release of the production order only. There is no functionality of creating inspection at the confirmation of the order

Regards

gajesh